Ottawa bridge
12
July 2012

Sarens removed two old bridges and installed new ones within one weekend in Ottawa, Canada. The highway was only closed between 6pm on Saturday and 7am Sunday, thus guaranteeing a minimum of traffic obstruction. The bridges weighed between 500 and 600t and they were moved by 80 axle lines SPMT's and the CS250 climbing system.