Sarens removed two old bridges and installed new ones within one weekend in Ottawa, Canada. The highway was only closed between 6pm on Saturday and 7am Sunday, thus guaranteeing a minimum of traffic obstruction. The bridges weighed between 500 and 600t and they were moved by 80 axle lines SPMT's and the CS250 climbing system.