Load-out for Fabricom
Sarens took care of the load-out of a giant offshore high-voltage station at the Fabricom Module Yard in Hoboken, Belgium. The module is part of what soon will be the largest windfarm in the world, London Array.
23
July 2011

Two modules of 1.250 tonnes each were loaded onto pontoons and were shipped to London Array, near Kent.

The first phase of the project will be ready in 2012, in time to provide power for the Olympic Games held in London.