Collgar Windfarm
Sarens Australia is undertaking its largest project to date, a wind farm near Merredin, Western Australia.
8
July 2011

Stage one of the project consists of 111 x V90 Vestas turbines spread over a 20 x 10 km site. The turbines are being erected in two stages. The first stage, base (76t) and middle (43,5t) tower sections, are being installed by an LR1350 and SCX 2800 with main boom while the main crane, a CC 2800, completes the wind turbines. The nacelle and hub are lifted in one piece and is the heaviest lift at 93t which is mounted on top of the 80m high towers.