Transport of pipe lay-tower
Location: Sliedrecht - the Netherlands
Equipment used: 60 axle lines SPMT's; 4 CS 600; 16 load cells; AC 700; 2 x LTM 1400-7.1; 2 x Sarens custom-built stooling
6
March 2014

Sarens was contracted by IHC to assist with the building of two pipe lay towers in Sliedrecht. Sarens' scope was to jack-up the  tower section (495t), place the tower on custom-built Sarens  stools, load-out on a barge and load-in the tower section at the  quay. Also included in the scope was the installation of two  tensioners, weighing of the completed tower (1,154t) as well as the  load-out on the barge to bring the completed tower to its vessel.