Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 832 714 0176

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778
Tel: 225 450 7027

Sales
info.us@sarens.com

Accounts
ap.us@sarens.com

The Veja Mate Project
Sarens carries out the load-out and transportation of the topside module transformer station for the Veja Mate Project.
21
January 2017

Sarens had been awarded the contract of load-out and transportation of the topside module for the Veja Mate Offshore Wind Mill Park. The task included the load-out of the topside module which is a transformer station for the offshore windmills.

Veja Mate is a 402 MW, 1.9 billion EUR offshore wind project owned by the Highland Group Holdings Ltd, Siemens Financial Services and CI II managed by Copenhagen Infrastructure Partners. Construction started on the 4th of April 2016 and the project is expected to be fully operational by the end of 2017. It will produce over 1,6 TWh of green, renewable electricity annually, equivalent to the annual consumption of 400.000 German households.

The sophisticated and heavy topside module weighed approximately 2500 tonnes, measuring 61m in length, 33m in width and 28.5m in height. Sarens deployed its reliable and efficient Barge Paula and 80 axle lines Self propelled modular trailers (type: K24ST) along with an external Ballasting system and Hydraulic winches to carry out the load-out and transportation of the module.

The load-out was carried out from the Hoboken facility of Fabricom onto the Paula Barge placed over the river Scheldt. It was a challenging task to perform as the load-out took place on the river section where there was a tidal difference of +/-6m. Therefore it was critical to safely transfer the heavy module onto the barge by perfectly balancing the weight.

The module was transferred to Paula very slowly using SPMT's and bridges that connected the barge to land. The barge was ballasted tactfully, taking over the weight from land, to keep it at level as more weight was being shifted from land to barge.

A total of 8 specialized crew members completed the task. Subsequently the Paula barge successfully transported the topside module to the Veja Mate site for installation.