Sarens' Rigging International performed a record setting rapid bridge move in North America, moving the 354 foot long, 3.8 million pound Sam White Bridge using self-propelled modular transporters during an overnight closure of the heavily traveled I-15 freeway. With several thousand spectators lining the freeway to witness the record setting move, the structure was transported from the temporary construction site and positioned over the eight lane freeway in less than five hours.