Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.
Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Wisconsin from where we cover the Midwest, and in Rowesville from where we cover the East coast.
We provide Engineered Heavy Lifting Services
Heavy Lifting
Heavy Transport Services
Decomissioning and Dismantling Services
Rental Services
SARENS IN THE USA
10855 John Ralston Rd
Houston, Texas 77044
+ 1 832 536 3669
+ 1 832 615 2678
info.USA@sarens.com
SARENS IN THE USA
9204-A Highway 61
Sorrento, Louisiana 70778
+ 1 225 450 7027info.USA@sarens.com
SARENS IN THE USA
15095 W 42nd St.
Odessa, TX 79764
832-493-5741info.USA@sarens.com
Sarens USA – East
75 N. Haddon Ave Suite 101
Haddonfield, NJ, 08033
+1 856 503 2121
Paul.Fuerneisen@Sarens.com
SARENS USA OFFSHORE WIND DIVISION
75 N. Haddon Ave Suite 101
Haddonfield, NJ 08033
856-873-0473
Paul.Fuerneisen@Sarens.com
SARENS NUCLEAR & INDUSTRIAL SERVICES
1430 South Goodland Road
Hartford, WI 53027
+ 1 414 299 0858
nuclear@sarens.com
Contributing to a greener environment, Sarens installed the first ever prototype of the fully automated kite - Seawing on the RoRo vessel, Ville de Bordeaux in La Rochelle, France.
Seawing, developed by Airseas, is a 500m² parafoil which flies at an altitude of 200m and harnesses wind power to provide traction and is estimated to reduce fuel consumption and emissions from cargo ships by up to 40 percent.
The first prototype of the Seawing was installed in December 2021 on the Ro-Ro shipping commercial vessel, Ville de Bordeaux, which transports major aircraft components between France and the US. The Seawing will be tested on this vessel for six months starting January 2022.
Sarens SL3800 successfully completed the single-object lift and installation of the Seawing weighing 120T on the vessel in open water. The team had to address the following challenges before lifting:
The SL3800 and two layers of wooden mats were deployed to manage the ground bearing pressure. By providing extra rigging equipment and performing a test lift, Sarens was able to level the Seawing within a tolerance of 10cm. During a perfect wind-window, the crawler crane smoothly and precisely lifted and positioned the load.
According to the Project Manager, Koen Rooms, “Sarens is glad to perform this unique lift as part of the innovative technology developed to harness green energy.”