Click here
Sarens
USA
Close
SARENS
IN THE USA

Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 832 714 0176

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778
Tel: 225 450 7027

Sales
info.us@sarens.com

Accounts
ap.us@sarens.com

Coal Export Facilities At North Vancouver’s Neptune Terminals
Sarens installs new overpass for first phase of major expansion project
1
June 2020

Sarens is pleased to be involved in the Neptune Terminals expansion project at the Port of Vancouver. Neptune Terminals, which bulk ships Canadian commodities to global markets, is improving its rail-based system to quadruple its annual coal export capacity. 

Since late 2018, Sarens has been working on the expansion project on behalf of its client, Fluor, and terminal co-owner, Teck Resources. The Group is involved in three distinct project phases, and has successfully completed Phase 1, erecting and installing a new overpass. Work on all three phases will continue through the end of 2020.

For the first phase of the project, 11 crew members used the LR-1600 crane, CS-250 jacking system, and 32 lines of SPMT. The team had to hoist and assemble nine over-dimensional girders across the top of seven active rail lines using the LR-1600. They then used the CS-250 jacking system to raise the completed overpass, which weighed approximately 600 tonnes, to a height of 7 metres for final transport. Finally, they deployed two 16-line SPMT units, with a support structure, for final transport across seven rail lines and to the final pier abutments.

The client was impressed with the speed and control at which the CS-250 lifted the overpass, as well as Sarens’ ability to position it with minimal clearances.

“The bridge move was flawless and that is down to you and your teams working together in the pre-planning of this lift,” said Dave Rooney, Construction Manager for Fluor Canada. “Please pass my thanks to all the team members and sub-contractors who contributed to achieving this project milestone, and for completing the move in a safe manner.”

Sarens will complete Phases 2 and 3 in the coming months. Phase 2 will involve the demolition and erection of modules for the new surge bin upgrade. For this, the crew will once again use the LR-1600, with a luffing jib, as well as 8 lines SPMT. Phase 3 will involve the installation of new conveyor galleries and transfer towers, as well as the transport and installation of two new rotary railcar dumpers and an indexer. For these, Sarens will use the Demag AC-500-2 and LTM-1400 all-terrain cranes, 24 lines of SPMT, and the LR-1600 crane.