Click here
Sarens
USA
Close
SARENS
IN THE USA

Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 832 714 0176

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778
Tel: 225 450 7027

Sales
info.us@sarens.com

Accounts
ap.us@sarens.com

Sarens Debuts New Jacking Solution for Schierstein Bridge
Sarens installed a 120m long, 2.000T bridge segment using new CS1000 jacking system
9
January 2017

Sarens is excited to announce the debut of the CS1000 jacking system, which was used to install a 2.000T, 120-meter long segment of the new Schierstein Bridge in Germany.

Since 1962, the Schierstein Bridge has spanned the river Rhine to connect two state capitals, Mainz and Wiesbaden. The bridge was originally designed to accommodate 23.000 vehicles per day, but within a few decades, it was straining under the daily load of 80.000 vehicles.

By the turn of the century, extensive corrosion had rendered the bridge beyond repair: authorities announced that the entire 1.282-meter long structure had to be abolished and replaced. Today, a new bridge is being built alongside the old bridge in phases, with completion slated for 2020.

A New Solution for a New Bridge

Sarens has been a part of the bridge replacement project since January of 2016, when teams transported and installed the first 2.000T bridge segment on the Wiesbaden side of the main Rhine channel.

More recently, Sarens performed the specialized transport and lifting of another 2.000T pre-assembled bridge segment, this time debuting the new CS1000 jacking system. The CS1000 system was designed to handle very high horizontal loads while minimizing limiting operation factors.

As before, working on the river posed a unique set of constraints. Because of the tremendous weight of the bridge segment, the Rhine had to reach a minimum depth of 3 meters before Sarens operators could transport the load on twin barges. Once water levels were right, the Rhine was closed to outside vessels for the four-day transport and lift operation.  

Water and weather conditions conspired to slow progress, but the team rose to the challenge to complete the project safely and efficiently. First, Sarens deployed twin barges to transport the 120-meter long structure to its final destination. Then, to install the segment, teams had to reach the work site via boat, as it was inaccessible by land. The crew twisted the bridge segment into its final position and implemented the new CS1000 jacking solution to raise it and complete the installation. 

The design of the CS1000 jacking system is based on years of experience with similar projects, including complex bridge installations. 

Its benefits include:

  • Safety:  No need for working at height during jacking
  • Stability:  The system can operate unbraced to 10 meters
  • Operation:  As an additional asset in between the CS5000 and  CS600, it meets a new class of client and market demands

Sarens has a tradition of creating innovative solutions to meet client challenges, and the CS1000 jacking system is a testament to that. The Group is proud of its successful debut during the Schierstein Bridge project and looks forward to deploying CS1000 for future operations.