Our new SGC-140 has been testing in Ghent, Belgium, the Lifting Frame we designed. An ingenious in-house Sarens conception to lift modules while causing the least deformation to them. The design ensures full load-control over the lifting points.
Click here to watch the #Howwedoit video!