Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Wisconsin from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

SARENS IN THE USA
10855 John Ralston Rd
Houston, Texas 77044
+ 1 832 536 3669
+ 1 832 615 2678
info.USA@sarens.com

SARENS IN THE USA
9204-A Highway 61
Sorrento, Louisiana 70778
+ 1 225 450 7027info.USA@sarens.com

SARENS IN THE USA
15095 W 42nd St.
Odessa, TX 79764
832-493-5741info.USA@sarens.com

Sarens USA – East
75 N. Haddon Ave Suite 101
Haddonfield, NJ, 08033
+1 856 503 2121
Paul.Fuerneisen@Sarens.com

SARENS USA OFFSHORE WIND DIVISION
75 N. Haddon Ave Suite 101
Haddonfield, NJ 08033
856-873-0473
Paul.Fuerneisen@Sarens.com

SARENS NUCLEAR & INDUSTRIAL SERVICES
1430 South Goodland Road
Rubicon, WI 53078
+ 1 414 299 0858
nuclear@sarens.com

Sarens Works in the Port of Le Havre for the Fécamp Offshore Wind Farm Project
Sarens performs load-out operations activities of the Fécamp offshore wind farm’s 71 gravity based structures.
18
October 2022

Sarens was commissioned by the consortium BSB (Bouygues Travaux Publics, Saipem and Boskalis) to work in the port of Le Havre on the lifting, transport onshore and load-out operations of 71 gravity based structures (GBS) of approximately 4,800T each, serving as foundations for wind turbine generators, from their manufacturing site in Le Havre onto cargo transportation barges.

The Fecamp offshore windfarm, located approximately between 13 and 22 km off the Normandy coast, will generate enough energy to provide sustainable electricity for more than 770,000 inhabitants.

Sarens, world leader in heavy lifting, engineered transport and crane rental, is playing a direct role in the construction of the wind farm by lifting,  transporting onshore and loading-out onto transportation barges the 71 gravity based structures (GBS) serving as foundations for the wind turbines. Each of these bases weighs approximately 5 000T, with a diameter of 31 meters at the base and a height between 48 and 54 meters.

To lift each of the GBS, a Gantry system is specifically created for this work, consisting of two different units which are moved around site on SPMT axle lines. After being positioned around each GBS, the load is secured by four lugs, and the two parts of the gantry system are interconnected by data cables so that they can operate as one. After lifting the GBS, it is positioned on 180 axle lines of SPMT for transport to the Cargo Barges at the quay side

To ensure the success of the operation, Sarens has installed on each of the three Cargo barges a sounding system capable of measuring the amount of water in the ballast tank, and a series of interconnected pumps for de-ballasting to be used during loading operations. It took more than 120 trucks and nearly three months of transport to the port of Le Havre for the Sarens technical team to have all the equipment necessary to carry out the entire operation. 

To ensure that the marine spread used for the installation offshore of the GBSs does not suffer downtime, Sarens will conduct a 24-hour loading process for the barges. Three foundation bases are loaded on each barge, in a continuous operation of maximum 38 hours per barge. This process must be repeated 24 times, which will require the participation of a large number of highly specialized personnel, not only for the loading maneuver itself, but also for all the operations related to the handling of the winches, the preparation of the gantry system in each operation or the reconfiguration of the SPMTs prior to the arrival and loading of each barge.

Sarens owns extensive international experience in the assembly and maintenance of wind farms. It is participating in installations in France such as Saint Nazaire, Provence Grand Large or more recently, in the lifting and transport work for the foundation bases of the new offshore wind farm in Saint Brieuc, off the Brittany coast, where it has been able to transport loads of more than 1,150T.

Watch the video here!