Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427
Fax: 406 543 4505
Conf Rm: 406 532 3093

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 803 534 1348

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778

Sales
info.USA@sarens.com

Accounts
SarensUS.AP@sarens.com

Sarens Transports Marine Loading Arms at the Talara Refinery
Sarens transports two marine loading arms weighing 35T each at the Talara refinery in Peru
27
February 2020

Technicas Reunidas asked Sarens to perform the challenging transport of the loading arms along the narrow curved passage. 

The loading arms had to be moved through a very tight space around 3m wide. The transport had to be performed on the second fortnight of November during an outage of the refinery. Missing this time window, the team would have had to wait for one month onsite till December outage.

The team decided to deploy one Kamag24 SPMT (1x12) with 2 power packs to move the load smoothly. The SPMT was the only choice because of its flexibility. The equipment was brought in by ship and trucks from Houston in 10 days and was set-up in a few hours.

Sarens transported two marine loading arms measuring 25x3.5x3.5m and weighing 35T through a narrow passage around 3m with two curves.

Sarens KAM, José Mª Martínez Gutiérrez says, “It is always great to work for Technicas Reunidas, our main Spanish client by far and even more working at a job site again after 3 years.” The Project Manager for Technicas Reunidas, Fernando Olmedo, adds, “Sarens did a very good job at Talara. The team was very professional and collaborative. The sales support before the awarding of the contract was as usual perfect, highlighting the support given at all times.”