Click here
Sarens
USA
Close
SARENS
IN THE USA

Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Wisconsin from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

SARENS IN THE USA
10855 John Ralston Rd
Houston, Texas 77044
+ 1 832 536 3669
+ 1 832 615 2678
info.USA@sarens.com

SARENS IN THE USA
9204-A Highway 61
Sorrento, Louisiana 70778
+ 1 225 450 7027info.USA@sarens.com

SARENS IN THE USA
15095 W 42nd St.
Odessa, TX 79764
832-493-5741info.USA@sarens.com

Sarens USA – East
75 N. Haddon Ave Suite 101
Haddonfield, NJ, 08033
+1 856 503 2121
Paul.Fuerneisen@Sarens.com

SARENS USA OFFSHORE WIND DIVISION
75 N. Haddon Ave Suite 101
Haddonfield, NJ 08033
856-873-0473
Paul.Fuerneisen@Sarens.com

SARENS NUCLEAR & INDUSTRIAL SERVICES
1430 South Goodland Road
Hartford, WI 53027
+ 1 414 299 0858
nuclear@sarens.com

Sarens Supports Pivotal Northern Lights Carbon Capture Project in Norway
Sarens SPMTs transport 12 tanks for vital carbon capture and storage initiative
11
April 2023

For several weeks in January, Sarens was involved in moving 12 carbon dioxide tanks on behalf of customer Aker Solutions As and the Northern Lights project. The Northern Lights project is part of the greater Norwegian carbon capture and storage initiative, Longship. The goal of the project is to capture carbon dioxide from industrial sources and ship it, in liquid form, to a subsea location in the North Sea for permanent storage.

Executed on site in Kollsnes, Norway, the transport operation called for 24 axle K24ST SPMTs and two Maxi PPUs. The K24ST SPMTs were selected due to their impeccable performance on similar projects. All the equipment was mobilised to the site via four trucks and required a half day of rigging to prepare for transport. The SPMTs arrived in mid-November and will remain on-site through mid-April.

For this operation, careful planning was vital. Sarens knew that load capacity would be critical at the site and that it was crucial to stay below 5T per square metre. Working with maximum precision and care, the Sarens SPMTs transported each tank from the quayside to the storage area, a distance of approximately 600 metres. Each of the 35-metre long, 230-tonne tanks was moved along two lines of 12-axle SPMTs with two power pack units. The tanks had to be transported at a certain height to get into the jobsite, Energiparken Rogn, through fixed entry gates. For this reason, high cribbing on the trailers was required.

Sarens would like to thank the SPMT supervisor and three operators involved in transporting the carbon dioxide tanks for this important project. The weather in Norway at this time of year can often be windy and unpredictable, but the team was able to complete the operation with perseverance, patience, and skill.