Click here
Sarens
USA
Close
SARENS
IN THE USA

Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Wisconsin from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Sarens USA
10855 John Ralston Rd
Houston, Texas 77044
+ 1 832 536 3669
+ 1 832 615 2678
info.us@sarens.com

Sarens USA
9204-A Highway 61
Sorrento, Louisiana 70778
+ 1 225 450 7027info.us@sarens.com

Sarens Nuclear & Industrial Services
122 River Drive
Rowesville, South Carolina 29133
+ 1 803 534 1348
+ 1 803 535 6093
nuclear@sarens.com

Sarens Nuclear & Industrial Services
1430 South Goodland Road
Hartford, WI 53027
+ 1 414 299 0858
nuclear@sarens.com

Sarens Loads-out Giant Modules in Norway
Sarens weighs and performs load-out of 5080T module
1
November 2021

For the second phase of the Johan Sverdrup oil field, Sarens was asked to weigh and load-out 5080T riser platform in Stord, Norway.

Johan Sverdrup oil field is the third largest oil field on the Norwegian continental shelf, with expected resources of 2.7 billion barrels of oil equivalent. Sarens has been associated with the project since past few years and has performed some of the significant lifts.

The equipment deployed by the crew of seven were:

  • 20 x 500T jacks and load cells
  • 160-axles SPMT Kamag K24ST
  • 12 Ramps
  • 16 ballast pumps 600BE

The riser platform weighed 5080T and measured 110mx61mx26m.

The Project Manager, Tor Arne Næss, described, “The module had to be weighed, moved on-site, rotated 180 degrees, and loaded-out on the barge in a closed dock.” The client appreciated our efforts and the Project Director, Arne Engevik remarked, "I am incredibly impressed by the effort, commitment, and team spirit shown by all involved. This is another confirmation of why the RP MOD - project is a success. Many thanks to everyone involved".