Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Wisconsin from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Sarens USA
10855 John Ralston Rd
Houston, Texas 77044
+ 1 832 536 3669
+ 1 832 615 2678
info.us@sarens.com

Sarens USA
9204-A Highway 61
Sorrento, Louisiana 70778
+ 1 225 450 7027info.us@sarens.com

Sarens Nuclear & Industrial Services
122 River Drive
Rowesville, South Carolina 29133
+ 1 803 534 1348
+ 1 803 535 6093
nuclear@sarens.com

Sarens Nuclear & Industrial Services
1430 South Goodland Road
Hartford, WI 53027
+ 1 414 299 0858
nuclear@sarens.com

Sarens Installs 57 Wind Turbines for Markbygden II Project in Sweden
17 cranes and 58 crewmembers work night and day to successfully install turbines
28
June 2021

Sarens is proud to have completed the installation of 57 E138 EP3 wind turbines at the Markbygden II site near Pitea, Sweden. The project was conducted on behalf of client Enercon, and called for the use of 17 cranes working in parallel to successfully install all of the wind turbine components. 

“Project Maximus – Markbygden II is located in the North of Sweden,” says project manager Adam Kopaczewski. “Due to very heavy winters in the region, the project was executed between May and November of 2020.”

Fifty-eight crew members worked together in two shifts, using several different cranes to unload tower sections, nacelles, generators, hubs, and blades; pre-assemble four tower sections, and install the turbines. The equipment used on-site included 17 cranes, almost all working in two shifts:

  • 2 x 200T cranes for unloading tower sections
  • 2 x 200T cranes for unloading nacelles, generators, hubs, and blades
  • 2 x LTM1750 + 200T for pre-assembly of tower sections
  • 4 x CC3800 + 160T for the main installation
  • CC388 with two configurations for two types of towers: LSL + LF3 126m + 12m and LSL+LF4 141m+12m

To get all the necessary equipment on site, cranes were mobilised from several business units within the Sarens Group, and transported to Sweden via road transport and linear ferries. In total, 200 trucks were used to bring the equipment to the Markbygden II site.

Sarens would like to congratulate everyone involved in this project, including project manager Adam Kopaczewski and the three site supervisors, 32 crane operators, 12 riggers, eight truck drivers, and three service technicians who gave their time and expertise to successfully complete this complex operation.