Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 832 714 0176

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778
Tel: 225 450 7027

Sales
info.us@sarens.com

Accounts
ap.us@sarens.com

Sarens Precisely Erects and Installs Refining Columns at The World’s Largest Refinery
Sarens was contacted by Reliance to perform heavy lifting works and installations of heavy refining columns in their ongoing J3 project.
25
October 2016

Reliance, one of the leaders in Oil and gas sector, is building world's largest Refinery & Petrochemical complex at Jamnagar, Gujarat. With crude processing capacity of 1.24 million Barrels per Stream Day (BPSD), the Jamnagar refinery is a trendsetter and has won several awards, including the prestigious 'International Refiner of The Year' award. It also enjoys the distinction of housing some of the world's largest units, such as the Fluidised Catalytic Cracker (FCC), Coker, Alkylation, Paraxylene and Polypropylene plants.

Sarens was contacted by Reliance to perform heavy lifting works and installations of heavy refining columns in their ongoing expansion project. The engineering and operations team analyzed the site and the tasks to be carried out and proposed lifting solution with the help of CC8800-1 in Boom booster configuration.

The crane was brought to the site from the nearby Sikka Jetty and was assembled in 14 days along with the boom booster kit. The project involved the erection and installation of 9 heavy refining, free on foundation, columns at HPIB DTA, J3 project, weighing between 460t to 620t and heights ranging from 68m to 75m.

The final lift of the Prefractionator Column was carried out by CC8800-1 BB in BSSL 114 m configuration along with a tailing crane CC2500. Slings were connected to the trunnion provided on vessel for main lifting and tailing. Lifting area was cleared of all obstacles to avoid any accidents and ensure all safety parameters. The ground bearing pressure, weather conditions, hydraulic hoses, motors and all important parameters were cross checked before proceeding for the lift.

The CC8800-1 smoothly moved to the lift location in complete coordination with the tailing crane and positioned itself to perform the lift. The column weighed 305 metric tonne with a height of 85m. The placement/pickup radius was 35/27m. The crane took precise 55 minutes to carry out the lift followed by final alignment and locking. Similarly the crane carried out the erection and installation of 8 similar and heavier columns.

The crane was successfully dismantled and left back happy clients. Sarens has been a trusted partner of Reliance for carrying out strategic lifts at their refinery. We also deployed our mightiest crane SGC 120 last year at the refinery to successfully carry out some crucial benchmark lifts. In words of our India Operations Head, Jatinder Seth, "Working in a Reliance project site is always challenging due to the tight schedule and stringent safety norms being followed by Reliance. It is a matter of great pride for Sarens Team in completing these heavy lifts in a thoroughly professional manner and without even a single incident. With successful completion of SGC 120 Lifts and now the Boom Booster we have been able to instil a strong confidence in the Reliance Project Team towards Sarens." 

For a full overview of the project, click here