Click here
Sarens
USA
Close
SARENS
IN THE USA

Sarens entered US Heavy lift and heavy haul space in 2009 by acquiring Rigging International, a company based in California. We officialy changed the name to Sarens USA, INC. in 2012.

Sarens USA, INC has offices in Houston from where we cover the Gulf area, in Montana from where we cover the Midwest, and in Rowesville from where we cover the East coast.

SERVICES

We provide Engineered Heavy Lifting Services

Heavy Lifting

  • We provide Project-based heavy lift services
  • Turnaround maintenance
  • Installation of turbines & generators
  • Erection of steel structures
  • Erection of heat exchangers
  • Installation of mechanical equipment, drums, casing / inlet ducts, vessels, pumps

Heavy Transport Services

  • Out of Gauge and abnormal load transport
  • Project based heavy transport
  • Rental of specialized transport equipment
  • Factory-to-Foundation

Decomissioning and Dismantling Services

Rental Services

  • We provide bare lease as well as operated rentals services
  • Skidding & jacking

OUR
MARKETS

  • New nuclear plant construction
  • Operating nuclear plant
  • Small Modular Reactor (SMR)
  • Decommissioning
  • Department of Energy (DOE)
  • Government
  • Thermal power plants
  • Oil & Gas
  • Petrochemical
  • Major civil projects including:
    • Airports
    • Bridges
    • Stadia
    • Ports & yards
    • Oversized heavy haul

EQUIPMENT

  • Hydraulic cranes
  • Cranes ranging from 90T to 3200T
  • Hydraulic jacks
  • Strand jacks
  • Self Propelled Modular Trailers
  • Semi trailers
  • Out of Gauge transport

OFFICES

Houston, Texas (Office & Yard)
10855 John Ralston Rd
Houston, TX 77044
Tel: 832 536 3669
Fax: 832 615 2678

Missoula, Montana (Office)
7168 Expressway
Missoula, MT 59808
Tel: 406 543 4427

Rowesville, South Carolina (Office & Yard)
122 River Dr
Rowesville, SC 29133
Tel: 832 714 0176

Sorrento LA (Yard)
9204-A Highway 61
Sorrento, LA 70778
Tel: 225 450 7027

Sales
info.us@sarens.com

Accounts
ap.us@sarens.com

Sarens Erects the Roof of the New Hungarian National Stadium in Budapest
Sarens tied up with KESZ to provide crane and heavy transport works at the New Hungarian Stadium "Puskas Ferenc" in Budapest.
10
July 2018

The Ferenc Puskás Stadium, located in the 14th district (Zugló) of Budapest, Hungary, will be a host to the UEFA Euro 2020. The construction of the stadium began in 2017 and is expected to be ready by 2019. It is planned to be an all-seater with a capacity of 67,889 and expects to be awarded the 5-star rating when construction is finished. The stadium is built in the place of the former Ferenc Puskás Stadium.

Sarens signed the contract with KSEZ to undertake the transport and lift of the outer and middle steel trusses of the roof of the new Puskas Ferenc stadium. In total the Sarens team will carry-out 76 transports and lifts at a ratio of 4 per week. 

To perform the lifts Sarens deployed:

  • CC6800 SWSL
  • 32 axle lines SPMT
  • 2PPU
  • Spacer units 

Originally, it was planned to deploy a 650T crawler crane but for the project it was required to perform more lifts from same crane position. After all the cost considerations and discussion with the client, it was decided to use a stronger and bigger crane. The strategic advantage the CC6800 offered was that the preparation time for each lift was reduced due to less crane positions, less Superlift handling, and ease to comply with the deadline of 4 lifts/week. It was also a challenge to find the best suited SPMT configuration which could support all different types of trusses in the right place without requiring configuration changes in between.

CC6800 was shipped from Peru and took 25 days to reach Antwerp from where the crane left by road for Budapest. Crane erection and SPMT preparation took two weeks, including installation of mats and Superlift. Special attention was given to the influence of the wind and most optimal solution was found to have a minimum of wind delays for the client. There was a last minute change of crane erection position, which was changed to a very narrow corridor. Our teams safely carried out the erection of the crane without interfering with the other tower cranes in the vicinity. 

Once erected, the crane had to lift outer and middle steel trusses of the roof sections. The trusses were fabricated in workshops in Hungary and brought to the site as stick build material. Trusses were built together at a distance of 150m from the stadium in a pre-erection area. The finalised trusses were picked-up from the pre-erection area by Sarens SPMTS and brought closer to the CC6800. The outer trusses weighed 125T and were lifted at a radius around 35m and the middle trusses weighed 85T and were lifted at a radius around 65m. 

Sarens would be performing transport and lifts of 75 trusses over a period of eight months and complete the project by October 2018. According to Sarens Manager Projects Group, Dirk Besters, "Sarens worked with excellence to have a crane, coming from another continent after custom clearance/ shipping/ road transport, on a very limited space, in a dedicated sequence, arrive in time on site, and safely perform the lifts of trusses. The client was very pleased with the solution offered and we had the Hungarian Prime Minister visiting the site and appreciating our efforts."