Buladelah
Location:Bulahdelah, New South Wales - AUSTRALIA
20
July 2014

Equipment used: LR1400-2 SDB; SCX2500

Sarens unloaded 180 x 82t Super "T" beams into storage, reloaded them with the SCX2500 and installed them from 14 locations with the LR1400-2.
The work was completed by only dismantling once to relocate from the south bank of the Myall river to the north bank.