Sundsvall
Sarens transported 9 bridge sections from Poland to Sweden with the barges Tom and Wim.
12
September 2013

The sections with weights till 2.400t and lengths till 150m were lifted to a height of 160m with in-house designed lifting equipment for the construction of the Sundsvall Bridge in Sweden.

 

Watch the movie here.