Sarens was awarded the heavy lift contract for the Hydrocracker project in the NIS refinery of Pancevo. This is a milestone in the overall modernization of the refinery. The two reactors (485t and 520t) were top of the list of heavy equipment to be installed in the new unit.
The contractual scope consisted of the following: 

  • transport, lifting and installation of over 55 pieces of equipment 
  • transport and lifting of air coolers 
  • unloading, transport, lifting and installation of heavy equipment


The equipment arrived in the port 3km away from the refinery.