Exchange of overhead crane
Location: Ghent, Belgium
Equipment: Sarlift, 2 x 6 axle lines SPMT's
9
September 2013

Sarens performed the exchange of a 30m overhead crane weighing 136t. 4 Sarlift towers on top of SPMT's were used to rotate and lower the overhead crane, so that another overhead crane could pass over it. The first one was then again lifted with the Sarlift, rotated and positioned. The operation took only four hours thanks to the good performance of the Sarens team.