The Black Diamond Project in Antwerp, Belgium, included the lifting of 5 columns (54t and 40m till 350t and 85m) and 1 sphere (347t and 20m diameter). Sarens was responsible for transport, lifting, grouting, and surveying the vessels. Sarens supplied cranes for lifting the columns and installing platforms for the expansion of a petrochemical plant.