Sarens was contracted by IHC to assist with the building of two pipe lay towers in Sliedrecht. Sarens' scope was to jack-up the tower section (495t), place the tower on custom-built Sarens stools, load-out on a barge and load-in the tower section at the quay. Also included in the scope was the installation of two tensioners, weighing of the completed tower (1,154t) as well as the load-out on the barge to bring the completed tower to its vessel.