At the Cosco Shipyard in Nantong (Qidong, China) Sarens lifted several modules with the SGC-120 for the construction of the topside of a drilling platform with a total weight of 15.000t. The heaviest module weighed 1.300t. To save space on-site the crane was assembled next to the quay then moved with SPMT's to its lifting position. The SGC-120 remained on site for the duration of the project as the crane did not obstruct the other on-site works.