Turnkey Project
LOCATION - Sasolburg - South Africa
EQUIPMENT USED - CC2800-1; AC650; LTM1400; AC300; 54 axle lines SPMT's
11
November 2011

Sarens is providing turnkey supervision, transportation and installation of all equipment over 20t in Sasolburg. In 6 months 3.150t of pipe rack modules, vessels and equipment were installed.

The installation of the equipment within an operating petrochemical plant was a real challenge. The site has a limited foot print and the plant is high and compact to accommodate all the equipment.