Sarens unloaded the press machine, which was transported horizontally on a truck, to a vertical position (tailing operation).
For this operation a spreader equipped with 2 sheaves was used. In order to use the boom of our crane, the client especially made a hole in the roof following Sarens' guidelines.
A 100t auxiliary crane was used to put the ballast onto the AC700.
To the client's satisfaction the full operation took only 1 day.