As Sarens' client had only a limited time frame available between the ship's arrival and the load-out, our biggest challenge proved to be the installation of all our equipment within a very short period. Sarens' team succeeded in preparing approximately 300 strands of the Strand Jacks within one day instead of the usual five! After a smooth preparation the load-out was executed successfully and 4 hours faster than planned.