Bakubang Mine
Location: Bakubang Mine, Wesizwe project, South Africa
Equipment used: CC2800-1; LTM1400-7.1
8
September 2013

Sarens was hired to assemble the entire main shaft for the Royal Ba kofeng Platinum Wesizwe Mine. The total shaft height after completion was 82,7m and the highest lift weighed 233t at 62m. All of the lifts were installed in modules.