Placing of 2 motorway bridges
LOCATION: Ilberstedt - Germany
EQUIPMENT USED - 2x 12 axle lines and 2x 14 axle lines; SPMT's;
skidding system
Two bridges (900T) built in the
construction area behind the foundations, were transported and laid
down on the Sarens skidding system by means of Kamags before the
closure of the railroad track. In a 30h time window, the Kamags
were rebuilt on the railroad level. In combination with the
skidding device on the back, the two 900t bridges were moved onto
their final position.