Sarens at work in the city centre
Location: Cepoy - France Equipment used: 2 x 6 axle lines
SPMT's; roro ramps of 23m
A concrete bridge of 220t (18 x 8m) over a canal in the city centre of Cepoy needed renewal. The old bridge was removed and transported to a demolition area and a new steel bridge was transported from the construction area located at 500m from the site. In this particular case RoRo ramps of 23m were used so that the SPMT's loaded with the bridge parts could cross the canal.