CC2800 in India
Sarens executed a special lift (critical in terms of % loading) with the CC2800 at the Opal DFCU & AU project in Dahej, India.
17
July 2013

A CC2800 erected module 13cc weighing 253t at a radius of 18m. A CC2400 was used as a tailing crane.

On the same site Sarens erected a pipe spool with a weight of 130t and a length of 42m. This lift was critical due to its unique bend design. Another important issue was the alignment with the column.