Sarens is currently working at Noordoostpolder Project in the Netherlands, where 38 wind turbines for Enercon are being erected. These turbines have a tower height of 135m and a capacity of 7,5MW each.
This project is a first for the Boom Booster, a replacement of the bottom part of a standard CC8800-1 boom, increasing its capacity with 60% and more. This Boom Booster, boosting the capacity of a CC8800-1 crane at short radii and long boom lengths by reducing the lateral deflection of the boom, was developed by Terex in close collaboration with Sarens.