A tight squeeze in Melbourne
Location: Melbourne - Australia
Equipment used: Kamag 2400 24 axle lines SPMT's; 2 PPU's
7
April 2013

Sarens transported a Navy vessel module weighing 350t and measuring 26m long, 13m wide and 22m high with 2 x 12 SPMT's at BAE Systems Dock yard in

Melbourne. Manoeuvring through narrow sections of the Williamstown dock yard proved to be a challenge, as well as the 10% slope onto Nelson Pier.