Sarens Australia performed the relocation of a 1,250t shovel at one of the mine sites in Hunter Valley, New South Wales. The shovel had been transported over a bridge and slopes up to 8%! Load distribution on the bridge and creation of suffi cient traction on the slopes were the key factors that made this transportation successful. A creative engineered setup of hydraulic jacks was used to distribute the load of the shovel on our trailers. This project is another major reference for Sarens' mining operations in Australia!